Skip to content

Service schedule

Fixed wiring, sized protection, and the certificate that matches.

Each service is a circuit job. We do not bundle medical equipment, and we do not arrange payment plans. You get a survey, a method, and test figures.

Consumer units

Board replacement and rearrangement.

A board change is scheduled when the existing unit cannot take another circuit, the enclosure is damaged, or protection no longer matches the wiring. We record the current schedule, isolate the tails, fit the new enclosure, and land circuits onto RCBOs or a documented split-load arrangement.

Labels go on as the last live act of the day: kitchen, sockets upstairs, lighting, boiler, spare. A blank way is marked spare, not left anonymous.

New consumer unit with RCBO ways labelled after a board replacement
Ref MS-PANEL · CU after landing · label set

Fault finding

Trips and dead circuits, from the board outward.

Nuisance RCD trips, a dark room, or a socket that died after a renovation are ordinary tickets. We prove dead, split the ring or radial, and find the joint, nail, or flooded box that is actually at fault.

F-01RCD

RCD / RCBO trips

Insulation and leakage checked per circuit. A wet underfloor joint is not “fixed” by swapping the device alone.

F-02Open

Open ring or radial

Continuity from the board, then from accessories, until the break is in the ceiling, wall, or floor void.

F-03Damage

Damaged accessories

Burnt sockets, loose neutrals, and cracked plates replaced, with the circuit retested before cover-up.

New points

Extra sockets, fused spurs, and lighting points.

New points are taken from a known circuit only when the survey says the load and the cable will take it. Otherwise we run a new radial from a spare way. Kitchen worktops, home-office walls, and stair lighting are typical. We do not daisy-chain extension leads into a “permanent” solution.

Cable routes follow existing voids where we can. Chasing is agreed in writing so plaster and paint are the household’s follow-on, not a surprise.

TWIN-and-earth cable prepared for a new radial from the consumer unit
Ref MS-CABLE · New radial · sized for the load

EV-ready circuits

A dedicated run for a charger — not a car, not a loan.

An EV-ready circuit is a dedicated cable from the board (or a documented sub-board), with the protective device, earth arrangement, and isolator the charger installer will need. We size the run for the agreed current. We do not sell vehicles, charger brands as finance, or grid-tariff products.

If the existing tails or main bonding are not up to the extra load, that is a finding on the survey. The charger unit itself is fitted only when it is listed on the job sheet; many households have a separate charger contractor land the unit onto our isolator.

Supply meter and tails checked before adding a dedicated EV-ready circuit
Ref MS-METER · Tails and origin · EV-ready survey

Certificates

Installation and periodic test paper.

New circuits and board changes leave with an installation certificate. Periodic inspection is booked when a landlord, buyer, or household wants a recorded condition of the installation. Limitations — loft not accessed, furniture not moved — are listed. We do not backdate certificates or sign work we did not test.

Licensed electrician documenting circuit tests at a domestic consumer unit
Ref MS-HERO · Test in progress · job file photo

Out of scope

Work we will decline on the first call.

Appliance repair as a manufacturer service, data-centre busbars, medical treatment rooms, and any request to bypass an RCD “so it stops tripping” without finding the fault. If you need a clinic, a bank, or a car dealer, this desk is the wrong number.